We lift air conditioning and HVAC equipment onto roofs, plant decks, balconies and mechanical platforms across Melbourne. Condensers, packaged rooftop units, chillers, cooling towers, and the old units that come off before the new ones go on.
The units themselves are rarely the difficult part. Getting a crane into a position where it can reach the middle of a roof, over a building, on a street with parked cars, is where these jobs are won or lost.
This catches out more HVAC jobs than anything else, so it is worth stating plainly. When replacing a rooftop unit, the crane must lift the old unit off and the new one on, making it a two-lift job. Between those lifts, technicians must disconnect the old unit, prepare the base, and position and secure the replacement while the crane remains on site. The lifting itself often takes only minutes, with most crane time spent waiting for the mechanical work. If the old unit is disconnected and the new base is prepared before the crane arrives, the job can be completed much faster. We plan the sequence with your installers to reduce waiting time and unnecessary crane costs. Tell us the unit, the roof and whether anything is coming off first for HVAC lifting across Melbourne, Geelong, Bacchus Marsh and Western Victoria.
Precise Rooftop Placement. Air conditioning units do not just need to get onto the roof. They need to land on a mounting frame, a plinth or an anti-vibration base, positioned correctly, without being dragged into place afterward.
Controlled Unit Lowering. That is a different skill from moving weight. It means controlled lowering, a rigging arrangement that keeps the unit level, and clear communication between the operator and the crew on the roof who can see what the operator cannot.
Protecting Roof Surfaces. It also means protecting what is already up there. Roof membranes and waterproofing are easily damaged, and a unit set down in the wrong spot, then shifted across a roof, is how leaks start. Landing it in position the first time avoids that entirely.
Compact Access Solutions. For units going into courtyards, balconies, plant rooms and other confined positions, a compact or tracked machine is often the better answer than a larger crane reaching from further away.
Accurate placement matters just as much as lifting capacity. Every air conditioning unit needs to be lowered safely into its exact final position while protecting the unit, mounting system and surrounding roof surface.
Residential and light commercial outdoor units placed onto roofs, balconies, plant decks and ground level plinths.
Commercial and industrial packaged units placed onto mounting frames and roof curbs on warehouses, offices and retail buildings.
Larger plant items positioned onto plant decks and mechanical platforms, usually with tighter placement tolerances and heavier weights.
Air handling units, duct sections, fans and mechanical services lifted to roof and plant room level.
Existing units lifted off for disposal or relocation, whether as part of a replacement or a standalone decommissioning.
Units placed into courtyards, light wells, basements and internal plant rooms where a standard crane cannot reach or fit.
Four steps, one phone call. Start yours now.
Four steps, one phone call. Start yours now.
Unit weight and dimensions, where it lands, roof height, where the crane can stand, the distance between the two, and whether an old unit is being removed.
Unit weight and dimensions, where it lands, roof height, where the crane can stand, the distance between the two, and whether an old unit is being removed.
Capacity checked at the actual radius, crane position assessed, permit requirements identified, and a quote issued with all costs itemized.
Capacity checked at the actual radius, crane position assessed, permit requirements identified, and a quote issued with all costs itemized.
Road occupancy and traffic management arranged, spotters booked where power lines apply, and the date coordinated with your installers.
Road occupancy and traffic management arranged, spotters booked where power lines apply, and the date coordinated with your installers.
Crane sets up, old unit removed if applicable, new unit lifted and landed on its mounting position, then the crane packs down.
Crane sets up, old unit removed if applicable, new unit lifted and landed on its mounting position, then the crane packs down.
Site assessment before booking. Crane position, reach to the landing point, roof height, overhead services, and street access confirmed at quoting.
Crane matched to the reach. Machine selected on the distance to the landing position rather than the unit weight alone.
Rigging for accurate landing. Slings and spreader arrangements set up to keep the unit level and land it on the frame the first time.
Permits and traffic management. Road occupancy and traffic control arranged where the crane occupies the street, which is common on suburban and commercial frontages.
Electrical spotters where required. Overhead powerlines are common on the streets these lifts happen from, and a registered spotter is supplied where the work falls within the specified distances.
Sequence planned with your trades. Timing is coordinated with the mechanical installers so crane time is spent lifting rather than waiting.
Working to a tight window because of council restrictions or trading hours? Call 0457 000 637 early, because permits and scheduling drive these jobs more than crane availability does.
Working to a tight window because of council restrictions or trading hours? Call 0457 000 637 early, because permits and scheduling drive these jobs more than crane availability does.
It is decided by reach rather than weight. Most units are well within the capacity of a mid-sized crane, but the machine has to hold that weight at the distance from where it can stand to where the unit lands. Send us both numbers, and we will check the load chart.
The main cost drivers are the crane size needed for the reach, how long the crane is on site, and whether permits and traffic management apply. Replacements cost more than straight installs because the crane waits between the two lifts. Call 0457 000 637 with the details for a figure.
A straight install is usually quick once the crane is set up. A replacement takes considerably longer, because the old unit has to come off and the technicians need time to disconnect it and prepare the base before the new one goes on.
Yes. Removals are done as part of a replacement or on their own where a unit is being decommissioned. Tell us if a removal is involved when you enquire, because it changes both the timing and the price.
If the crane stands on the road, footpath or nature strip, generally yes. Road occupancy permits and traffic management are arranged as part of the engagement, and they take lead time, so raise the job early.
Overhead services are common on the streets these lifts work from. Where the crane operates within the specified distances from powerlines, a registered spotter is required. We assess this during the site review.
The crane never touches the roof. What matters is landing the unit accurately onto its mounting frame rather than setting it down and dragging it into position, which is how roof membranes get damaged. Controlled lowering and correct rigging prevent that.
Common in the inner suburbs and usually workable. It generally means a city class crane rather than a larger machine, plus traffic management to clear the setup area. It is a planning question rather than a barrier.
Yes. Confined positions often suit a compact or tracked machine that can get closer rather than a larger crane reaching from the street. We will tell you which approach is cheaper for your site.
Yes, and the job runs better when we do. Planning the sequence with your technicians beforehand is the single biggest saving available on a replacement, because it cuts the crane’s waiting time.
Often, and on retail and commercial sites, it is sometimes the only workable option. Trading hours, council restrictions and building access all factor in, and out-of-hours work may carry its own conditions.
All Melbourne metro suburbs, with Maidstone, Werribee and Caroline Springs among the areas we attend most often, extending through Geelong, Bacchus Marsh, Melton and Ballarat, plus regional Victoria.
0457 000 637
Open 24 hours
25 Rowsley Station Rd, Maddingley VIC 3340
Cranes reach site from 25 Rowsley Station Rd, Maddingley VIC 3340 on the Western Freeway, driving straight to the job with no float transport, which makes early starts and short notice bookings realistic. Maidstone is where the street decides the job. Narrow frontages, parked cars and overhead lines along most streets mean these lifts almost always involve a city class machine, a permit and a spotter. It is worth quoting early there rather than the week before.